HORIZONTAL DIRECTIONAL DRILLING

We provide a safe and efficient solution for “Horizontal Directional Drilling” with a minimal effect and impact on the environment and public.

Why us?
We specialize in HDD with pre and after-contract options. We provide,

*Lower impact on the ground- *Trenchless installation is more secure
higher safety – safer than destructive digging
*Faster and accurate competition – more efficient than excavation
*Cost and time saving – low labor and restoration cost compared to excavation.

 

What do we do?

Telconnex Horizontal directional drilling involves 10 steps.

 1.⁠ ⁠Pre-planning – We check construction plans and utilize the construction.
 2.⁠ ⁠Construction site visit – We plan the construction with a minimal impact on the public and the environment
 3.⁠ ⁠Obtain tickets – Apply for BYDA plans
 4.⁠ ⁠Inform the relevant authorities and public – Obtain permits for the project and notify relevant authorities
 5.⁠ ⁠Underground asset locating – We locate everything!! Telconnex ensures what is and what is not in the underground with depths and tolerances.
 6.⁠ ⁠potholing – We use Nondestructive digging methods to ensure the located underground services.
 7.⁠ ⁠Pilot hole and exit hole – We analyze the construction site and make two holes according to the pre-plan and construction plan.
 8.⁠ ⁠Drilling and tracking – Our experienced drillers and trackers make sure the borehole is within the accurate depth and tolerances from the ground as well as from other services according to the requirements and tolerances.
 9.⁠ ⁠Pullback – Finally, the pipeline is attached and pulled back through the borehole and we do “Track-back” to confirm the correct installation.
10.⁠ ⁠Finalize the project – We re-estate potholes, and pilot and exit holes as good as they were before.

 

teleconnex-au

Telconnex guarantees 100% customer satisfaction and on-time project closure. We have completed more than 500 HDDs and counting.